Performing a partial or total shedding of the boiler ?

Connect the output(s) of the shedder to the shedder terminals numbered 11 to 13 on the boiler (see technical manual).

  • The output(s) of the shedder must be dry contacts.

OR:

Use parameter 23 to choose the shedding level

  • In the parameter settings menu, set parameter 23 to the value:
    • 03: 1st triac shedding
    • 04: 1st + 2nd triac shedding
    • 05: 1st + 2nd + 3rd triac shedding
Image Cercle Intuis

Can't find the answer to your question?